The Old Power Plant
»
The Rebuild
»
Interior
»
Step 05
»
“Step 05”
View this set @
www.
flick
r
.com
The second floor takes shape, more wiring is apparent, and we've got a new drain pipe.
Fig.1
Second floor progress
Fig.2
We're still well below the ceiling of the building
Fig.3
The clerestory windows we need to replace
Fig.4
Looking south along the 2nd floor walkway
Fig.5
Main interior hall
Fig.6
Seasonal walkway
Fig.7
The lobby/entrance
Fig.8
Spaghetti
Fig.9
Conference room
Fig.10
Armor Coating
Fig.11
Looking up from the southeast corner
Fig.12
Some lonely brick at the end of the hall.
Fig.13
A new drain replaces ugly PVC.