“No windows, but we have more stone”
Inching closer towards putting in some actual windows, we now have some new limestone installed at the base of all the windows. This was how the building was originally, and we reused a good bit of the original limestone. We also have the interior sand blasted, so it looks a good bit cleaner in there now. They tell me the windows will be coming soon now...
Fig.1
Fig.2
Fig.3
Fig.4
Fig.5
Fig.6
Fig.7
Fig.8
Fig.9